Eldfisk 2/7S B01 & F01 for Vistal Gdynia SA - welding inspections

As part of cooperation on Eldfisk 2/7S project with Kværner and Aker Solutions, we were asked to supervise and inspect construction sites in Poland as well. As result in March 2012, a contract was signed with Vistal Gdynia SA for work in the field of inspection of welded structures. Welding inspections will be carried out as part of work on two structures:

  • Bridge B01, a bridge connecting the Eldfisk II platform with the Ekofisk platform complex.
  • Flare F01, a 105 meter high flare of the Eldfisk II platform.

Our certified IWI teams will taking care of whole welding process including keeping a register of weld defects and approval of construction readiness for next production stages.

Levererar specialister i världsklass för att accelerera dina projekt, förhindra förseningar och uppnå branschledande kvalitet i hela Europa.

POLAND
SEC Pomorze Sp. z o.o.
Twarda 12
80-871 Gdańsk
NIP 957 104 71 98
NORWAY
SEC Norge AS
Kårevikstølen 47
5412 Stord
MVA 898 125 882
GERMANY
SEC GmbH
Kurfürstendamm 226
10719 Berlin
HRB 248467B
UNITED KINGDOM
SEC GB&NI Ltd
18 London Road, Portsmouth
England, PO2 0LH, UK
Company no. 13763919

© Copyrights 2026 SEC Pomorze Sp. z o.o. Alla rättigheter förbehållna.

Designad av Product and Business Developer Marcin Piłat