[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$f2cb16d62r6t6h":3},[4],{"id":5,"Title":6,"Slug":7,"Date":8,"Story":9,"Links":10,"createdAt":11,"updatedAt":12,"publishedAt":13,"MainVisualContent":10,"SidePhotos":10,"SideVideos":10,"Documents":10,"Projects":14,"Clients":45,"Countries":52,"Locations":58,"Companies":65,"Tags":72},6,"Eldfisk 2\u002F7S B01 & F01 for Vistal Gdynia SA - welding inspections","eldfisk-2-7-s-b01-and-f01-for-vistal-gdynia-sa-welding-inspections","2012-03-01","As part of cooperation on Eldfisk 2\u002F7S project with Kværner and Aker Solutions, we were asked to supervise and inspect construction sites in Poland as well. As result in March 2012, a contract was signed with Vistal Gdynia SA for work in the field of inspection of welded structures. Welding inspections will be carried out as part of work on two structures:\n\n- Bridge B01, a bridge connecting the Eldfisk II platform with the Ekofisk platform complex.\n- Flare F01, a 105 meter high flare of the Eldfisk II platform.\n\nOur certified IWI teams will taking care of whole welding process including keeping a register of weld defects and approval of construction readiness for next production stages.",null,"2022-04-15T06:15:06.372Z","2022-04-20T07:01:58.572Z","2022-04-15T06:15:08.614Z",[15,21,27,33,39],{"id":16,"Project":17,"createdAt":18,"updatedAt":19,"publishedAt":20},7,"Ekofisk","2022-04-19T08:40:31.903Z","2022-04-19T08:40:32.822Z","2022-04-19T08:40:32.819Z",{"id":22,"Project":23,"createdAt":24,"updatedAt":25,"publishedAt":26},9,"Eldfisk","2022-04-19T08:40:54.508Z","2022-04-19T08:40:55.638Z","2022-04-19T08:40:55.635Z",{"id":28,"Project":29,"createdAt":30,"updatedAt":31,"publishedAt":32},10,"Eldfisk 2\u002F7S","2022-04-19T08:41:01.840Z","2022-04-19T08:41:02.557Z","2022-04-19T08:41:02.554Z",{"id":34,"Project":35,"createdAt":36,"updatedAt":37,"publishedAt":38},11,"Eldfisk 2\u002F7S B01","2022-04-19T08:41:08.571Z","2022-04-19T08:41:09.294Z","2022-04-19T08:41:09.292Z",{"id":40,"Project":41,"createdAt":42,"updatedAt":43,"publishedAt":44},12,"Eldfisk 2\u002F7S F01","2022-04-19T08:41:15.652Z","2022-04-19T08:41:16.847Z","2022-04-19T08:41:16.843Z",[46],{"id":47,"Client":48,"createdAt":49,"updatedAt":50,"publishedAt":51},15,"Vistal Gdynia","2022-04-19T09:59:09.790Z","2022-04-19T09:59:10.347Z","2022-04-19T09:59:10.344Z",[53],{"id":16,"Country":54,"createdAt":55,"updatedAt":56,"publishedAt":57},"Poland","2022-04-19T10:07:53.865Z","2022-04-19T10:07:54.662Z","2022-04-19T10:07:54.659Z",[59],{"id":60,"Location":61,"createdAt":62,"updatedAt":63,"publishedAt":64},5,"Gdynia","2022-04-19T10:01:26.831Z","2022-04-19T10:01:27.672Z","2022-04-19T10:01:27.669Z",[66],{"id":67,"SEC":68,"createdAt":69,"updatedAt":70,"publishedAt":71},2,"SEC Pomorze Sp. z o. o.","2022-04-19T08:44:52.670Z","2022-04-19T08:44:53.953Z","2022-04-19T08:44:53.948Z",[73,78,84,90,96],{"id":22,"Tag":74,"createdAt":75,"updatedAt":76,"publishedAt":77},"Inspection","2022-04-19T08:21:51.816Z","2022-04-19T08:21:56.870Z","2022-04-19T08:21:52.629Z",{"id":79,"Tag":80,"createdAt":81,"updatedAt":82,"publishedAt":83},13,"Supervision","2022-04-19T08:22:46.120Z","2022-04-19T08:22:46.763Z","2022-04-19T08:22:46.760Z",{"id":85,"Tag":86,"createdAt":87,"updatedAt":88,"publishedAt":89},28,"IWE","2022-04-19T08:28:05.850Z","2022-04-19T08:28:06.983Z","2022-04-19T08:28:06.980Z",{"id":91,"Tag":92,"createdAt":93,"updatedAt":94,"publishedAt":95},29,"IWI","2022-04-19T08:28:13.449Z","2022-04-19T08:28:14.234Z","2022-04-19T08:28:14.231Z",{"id":97,"Tag":98,"createdAt":99,"updatedAt":100,"publishedAt":101},31,"NDT","2022-04-19T08:28:47.063Z","2022-04-19T08:28:47.750Z","2022-04-19T08:28:47.747Z"]